Use practical review questions to define the issue, identify ownership, document impact, and prepare a useful handoff.
Distinguish hard facts from assumptions on site immediately.
Identify who has the authority to sign off and approve.
Record cost, schedule delays, and affected subcontractors.
Explore our core guides on formulating, evaluating, and closing out critical construction decisions directly from the job site.
Learn the structured process of defining, documenting, and resolving critical issues directly on the construction site.
Master the techniques to trace site anomalies back to their structural, logistical, or design origins to prevent recurrence.
Establish clear lines of authority and accountability among project managers, superintendents, and subcontractors.
Quantify the direct and indirect financial consequences of field adjustments before signing off on changes.
We believe in absolute transparency. The FieldDecision Manual is highly specialized. Read who will benefit most and who should skip it.
Discover how the FieldDecision methodology fits into your existing construction management workflow and software suite.
Track field decisions, manage RFIs, and coordinate site instructions directly within your Procore workspace environment.
Mark up field conditions directly on blueprints, sync changes instantly, and resolve field queries on mobile devices.
Connect site operations with project management tools to ensure field decisions align with design specifications.
Standardize PDF markups, track revision histories, and ensure field directives are visually precise and cataloged.
Incorporate field decision lag times into master schedules and evaluate critical path delays effectively.
Manage complex schedule delays and calculate the cumulative cost impact of site-level changes across operations.
Master the essential on-site terminology. Understand critical project documentation, directives, and field decisions in a single glance.
A formal question asked by the contractor to the design team to clarify blueprints or specifications.
Documents, shop drawings, or product samples sent by the contractor for architect approval before installation.
A formal agreement to modify the original contract amount, scope, or schedule due to unforeseen site conditions.
A written instruction issued by the owner or architect to perform work immediately, bypassing formal change order delays.
A verbal or written resolution to an immediate construction issue made directly on-site to keep the workflow moving.
A document listing minor repairs, corrections, and finishes that must be completed before final project handoff.
Revised set of drawings submitted by a contractor upon project completion, showing the actual dimensions of the work.
The stage where the work is sufficiently complete for the owner to occupy or use it for its intended purpose.
Detailed diagrams prepared by a contractor showing how specific components will be fabricated and installed.
Try adjusting your search query or switching categories.
Need templates to document these field events? Explore Document Forms & Checklists
How leading construction publications and industry experts evaluate our field-decision methodology.
"A masterclass in reducing field friction. The FieldDecision Manual provides a bulletproof framework for real-time construction adjustments."
"Standardizing on-site resolutions is the next frontier in risk mitigation. This methodology is a must-have for modern project managers."
"Eliminates the ambiguity of field directives. A simple, structured approach to keeping trades aligned and schedules intact."
"Finally, a practical guide that bridges the gap between field reality and official RFIs. Highly recommended."
All response times are backed by our service level agreement for active construction project licenses.
Need immediate assistance with a field decision? Reach out to our support desk through any of the channels below.